Search Catalog
      GO   
 All Categories    Flash Economizers
All Categories > Flash Economizers > View Items  

Flash Economizers

Check up to five results to perform an action.

Continuous Blowdown Heat Recovery System for Boiler Surface Blowdown.

Most boiler manufacturers and water treatment companies recommend boiler water TDS be maintained at certain levels. The purpose of continuous blowdown is to continuously take boiler water from 4"-6" under the surface where the TDS is at its highest concentration so that it can be replaced with fresh water. While continuous blowdown is the best way in controlling these solids in the boiler the heat lost to drain over time can be tremendous. Penn Continuous Blowdown Heat Recovery Systems can recover 90% or more of this heat normally lost. Two stages provide the heat recovery.





    border="0" Printable Page  
    Email Email This Page  
    Save To Favorites Save To Favorites
  
Compare Items
   
  Results 1 - 10 of 10 1 

Item #

Item Name

AHR-3 9 Gallons Per Minute (gpm) Makeup Flash Economizer
AHR-6 12 Gallons Per Minute (gpm) Makeup Flash Economizer
AHR-10 20 Gallons Per Minute (gpm) Makeup Flash Economizer
AHR-20 40 Gallons Per Minute (gpm) Makeup Flash Economizer
AHR-30 60 Gallons Per Minute (gpm) Makeup Flash Economizer
AHRB-3-15 15 Gallons Per Minute (gpm) Makeup Flash Economizer
AHRB-6-30 30 Gallons Per Minute (gpm) Makeup Flash Economizer
AHRB-10-50 50 Gallons Per Minute (gpm) Makeup Flash Economizer
AHRB-20-100 100 Gallons Per Minute (gpm) Makeup Flash Economizer
AHRB-30-150 150 Gallons Per Minute (gpm) Makeup Flash Economizer
  Results 1 - 10 of 10 1 
Footer