Home
About Us
Contact Us
Sales Info
Samples
Find a Rep
Search Catalog
By Item #
By Keyword
All Categories
Flash Economizers
All Categories
>
Flash Economizers
>
Item # AHR-6
Item # AHR-6, 12 Gallons Per Minute (gpm) Makeup Flash Economizer
Printable Page
Email This Page
Save To Favorites
Please wait…
larger image
Continuous Blowdown Heat Recovery System for Boiler Surface Blowdown.
Most boiler manufacturers and water treatment companies recommend boiler water TDS be maintained at certain levels. The purpose of continuous blowdown is to continuously take boiler water from 4"-6" under the surface where the TDS is at its highest concentration so that it can be replaced with fresh water. While continuous blowdown is the best way in controlling these solids in the boiler the heat lost to drain over time can be tremendous. Penn Continuous Blowdown Heat Recovery Systems can recover 90% or more of this heat normally lost. Two stages provide the heat recovery.
Specifications
·
Features
·
Additional Information
Specifications
Brands
Penn
Features
Complete System frame mounted with the necessary controls in a vertical design to save valuable boiler room space.
ASME Code rated flash chamber with a tangential inlet and a centrally located vent providing 97% quality steam.
Ease of Maintenance because of the flanged vertical drop down coil section and external controls.
Multiple Boilers can use a single system even if at different pressures. Unit operates at lower venting pressure.
Additional Information
The first is the flash area where the high pressure condensate flashes to a low pressure steam use such as a feedwater heater or deaerator. In the second area is a heat exchanger that transfers the remaining heat to the Makeup water.
MORE IMAGES
·
Flash Economizers - 2
·
Selector Chart for Flash Economizers
DOWNLOADS
Brochure for Flash Economizers
(PDF, 1922KB)
Schematic Diagram of Penn Products
(PDF, 401KB)